At Barclay Engineering, We can construct one of the most efficient fuel systems possible. Our fuel systems will provide you with the following equipment:
-
1.Size: all dependent on the site location (there is no standard size) all are custom built
-
2.Bulk Tank
-
3.Daily usage Tank
-
4.Fuel fill system
-
5.All fuel systems come with suitable sized fuel transfer pumps
-
Piping will be done from the Bulk tank using level control and pump controllers
-
7.Gate Valves of various diameters- Where required Fittings
-
9.Bulk Tank Safety Valves (2).
-
10.Gate Valves of various diameters – Where required.
-
11.Fuel Pumps – To suit fuel requirements.
-
12.Yankee Flanges – Due to Day Tank by-passes there have been increases in the quantities of Yankee Flanges from the original scope.
-
13.Fuel Lines (Fill Point To Bulk Tanks ) – Now Approximately 70LM
-
14.Fuel Lines (From Bulk Tank to Day Tanks)
-
15.Fuel Lines (From Day Tanks to Engines)
-
16.Fuel Lines (Return & Drain lines from Day Tanks to Bulk Tank).
-
17.Bulk Tank Vent Piping.
-
18.Labor Component.
-
19.Pipe Paintworks.
20.Bulk Tank Fittings – due to the decrease in the number of Bulk Tanks to 2, Gauges, Level Indicators and other fittings have been decreased proportionately
For a clear view of the fuel system sample please download the .pdf file from the Documents Section and download the file " Fuel Sample"
|